Made here. Delivered everywhere.

End-to-end control from our Australian manufacturing facility to your customer's door — with live tracking at every stage.

Built in Australia, to your specification

Our main manufacturing facility operates across 3,000 m² of floor space, with dedicated production lines for each product family. Because we manufacture to order — not to stock — your customers receive products built precisely to their specifications, not pulled from a warehouse shelf.

CNC precision cutting, powder-coat finishing, thermal-break insertion and in-house quality inspection all happen under one roof. Every item is inspected before dispatch.

3,000 m²
Manufacturing floor space
9
Dedicated product lines
100%
Made to order — no excess stock
5 days
Lead time on blinds
Manufacturing facility

Typical lead times by category

All lead times are from confirmed order. Urgent orders may be available — ask your account manager.

5 days

Blinds & Curtains

Roller blinds, roman blinds, sheer & blockout curtains made to measure in 5 business days.

5–7 days

Security Doors & Flyscreens

Stainless security mesh, triple-lock doors, retractable and fixed flyscreens.

7–10 days

Plantation Shutters

PVC and basswood plantation shutters with louvre adjustment hardware.

10–15 days

Windows & Doors

Aluminium and thermal-break windows, bi-fold, sliding and hinged doors.

7–14 days

Roller Shutters

Extruded aluminium roller shutters — manual and motorised profiles.

5–7 days

Motorisation

Somfy, Rollease Acmeda and BrandNew Look motor kits, hubs and RF remotes.

National warehouse network

Strategically located hubs reduce transit times to metro and regional markets across all states and territories.

HQ

Melbourne, VIC

Main manufacturing + distribution hub

Metro VIC same/next day. Regional VIC 1–2 days.

Sydney, NSW

Distribution hub — blinds & shutters

Metro NSW next day. Regional NSW 2–3 days.

Brisbane, QLD

Distribution hub — all categories

Metro QLD 1–2 days. SEQ same day available.

Adelaide, SA

Freight transfer point

Metro SA 2–3 days. Regional SA 3–5 days.

Perth, WA

Freight transfer point

Metro WA 4–6 days. Regional WA 5–8 days.

All Territories

TAS, NT, ACT covered

TAS 2–4 days. NT/ACT 4–7 days.

Know where every order is, at any time

The trade portal shows manufacture progress in real time: cut, assembled, finished, QC passed, dispatched and in-transit. Freight tracking is automatically linked to each order — you see the same information your customer sees.

  • Manufacture stage updates (cut → finish → QC → dispatch)
  • Automated freight consignment creation on dispatch
  • Email + SMS delivery notifications to your customer (opt-in)
  • Live freight partner portal links embedded in your orders
Join the Network

Ready for factory-direct supply with national delivery?